Prior US Fish & Wildlife Service Objections Must Be Analyzed
The US EPA recently proposed a revised cleanup plan for Dupont Pompton Lakes contamination (see: EPA issues revised Dupont cleanup plan)
The key issues in the plan are whether the dredging proposed by EPA is adequate to remove all the mercury from the Lake sediments, upland areas around Acid Brook, and downriver to protect fish and wildlife and whether EPA and USFWS will require Dupont to compensate the public for millions of dollars in damages to natural resources caused by their toxic mess.
The issues are extremely complex and require that prior cleanup plans be reviewed, especially to determine if US FWS prior concerns were addressed.
But, on October 30, the EPA proposed the minimum public comment period allowed under RCRA regulations – public comment period expires December 18, just 10 days after the formal public hearing on December 8. Worse, that incredibly short period is consumed by Thanksgiving commitments and holiday preparations.
That is completely inadequate, so I joined with residents to write EPA Regional Administrator Enck, who has promised to expand community involvement in cleanup decisions, the following letter:
October 31, 2014
Dear Regional Administrator Enck:
We are pleased that EPA proposed a draft RCRA Corrective Action permit modification to Dupont for the partial remediation of off site releases of mercury.
We are also pleased, as stated in the draft RCRA permit modification, that US EPA consulted with the US Fish and Wildlife Service prior to public noticing the draft permit.
The scientific basis for the remedial activities required by the draft permit is complex. The remediation is driven by the ecotoxicology of mercury, especially the effects of bioaccumulation on fish and wildlife and human health.
As you know, during the previous RCRA permit cycle, in a February 9, 2012 consultation letter – which was issued after the close of the public comment period and thus unavailable for public review during the permit process – the USFWS raised significant concerns regarding the prior draft permit, see:
http://www.peer.org/assets/docs/nj/2_21_12_FWS_Pompton_Lakes_review.pdf
In that letter, USFWS stated:
“The Service does not believe that the proposed remedial action, as currently planned, will completely address historical releases nor be sufficient to protect against future injury to Federal Trust resources from residual contamination originating from the PLW…. The Service may consider performing a Natural Resource Damage Assessment (NRDA) to evaluate injury to Trust resources from historical exposure and residual contamination following the proposed remedial action, and we have initiated contact with the Applicant in that regard.” (emphasis mine)
USFWS went on to raise substantive objections to, among other things, the ecological assessment that formed the basis of the remedial plan and permit modification.
Accordingly, given the critical importance of the ecological issues, we need sufficient time to fully review the draft permit, particularly in light of USFWS’s prior 2012 concerns.
We need to fully understand how those concerns were addressed in the 2014 version of the cleanup plan, particularly in light of the major work negotiated by EPA and conducted by Dupont during the Environmental Appeals Board process.
In order to review the complete administrative record – in addition to the documents posted on EPA’s website and otherwise made available by EPA – we are contemplating FOIA requests.
Given FOIA timeframes and the complexity of this draft permit, we ask that the public comment period be extended by at least 60 days so that we may review the full administrative record.
We appreciate your prompt and favorable consideration.
Respectfully,
Lisa J. Riggiola, Executive Director, CCPL
Bill Wolfe, Director, NJ PEER
Pingback: 当店で安価な本物の購入
Pingback: maillot juventus pas cher 2015 2016
Pingback: オンラインショッピング時には、最低価格を支払うことができます!
Pingback: 販売について
Pingback: 焼けるように暑い販売
Pingback: 自信を持ってショップ。
Pingback: 最大70%割引
Pingback: 割引80%オフまふ
Pingback: コマーシャル
Pingback: 購入割引
Pingback: グレース
Pingback: 高級品店で販売
Pingback: クリアランスオンライン
Pingback: あなたのライフスタイルに隠された嘘の宝を発見
Pingback: ショップ安い
Pingback: 78パーセントまでのオフ
Pingback: 公式ストアで
Pingback: 大きい割引
Pingback: 貯金
Pingback: 公式デザイナーラグジュアリーアイテムのオンラインストア、
Pingback: 当社の専門のオンラインストアで
Pingback: 保証商品&24時間365日オンラインサービス!
Pingback: 608OFF
Pingback: 今買い物にあなたを歓迎
Pingback: 65%を保存すゐ
Pingback: カレンツ
Pingback: 100%品質保証および世界中へお届け
Pingback: 出会い、お見合い
Pingback: 販売のため
Pingback: ファッション
Pingback: 友人を訪問
Pingback: オーダー
Pingback: 今すぐ保存
Pingback: 今、これらの価格を活用する
Pingback: 蝶ネクタイ
Pingback: ユニットワンパーソナリティ
Pingback: 自慢の種
Pingback: パワフル
Pingback: 販売へ
Pingback: オンライン販売
Pingback: 激安セール
Pingback: 工場出荷時の価格
Pingback: バーゲンブラスト
Pingback: 割引80%オフまま
Pingback: 65%オフ
Pingback: ハンディ
Pingback: 寛大さ
Pingback: 見つける
Pingback: あなたが選ぶことができます。
Pingback: 最新の安い購入します。