BREAKING: EPA Withdraws Dupont’s Pompton Lakes Mercury Cleanup Permit

EPA Effectively Admits Legal Error 

Withdrawn Permit Moots Dupont’s Appeal

Unclear How Ecological Impacts and USFWS Concerns Will Be Addressed

The permit appeal process should not be used as hammer by Dupont to force EPA concession and it is not a permission slip for EPA to negotiate a cleanup plan Dupont will support behind closed doors. ~~~ Bill Wolfe, 8/30/13

Keep in mind that this withdrawal occurred after months of closed door negotiations with Dupont in response to Dupont’s legal appeal of the final permit last year. (see

That chronology strongly suggests that EPA is folding and relaxing cleanup requirements, not merely correcting the minor procedural defect Dupont alleged. If the EPA intent was to remedy a procedural defect, they could have re-proposed the permit months ago.

From our friends at PEER:

Press Release 

For Immediate Release:  Thursday, May 1, 2014

Contact:  Bill Wolfe (609) 397-4861; Kirsten Stade (202) 265-7337 

EPA Badly Fumbles Jersey Pompton Lakes Toxic Cleanup

Permit Withdrawal Throws Eco-Safeguards into Doubt While Adding Years of Delay 

Trenton — The U.S. Environmental Protection Agency is making one of the nation’s longest toxic removal operations even longer with the announcement that it is withdrawing its permit for the heavily contaminated Pompton Lakes area cleanup plan.  By going back to the drawing board, EPA raises serious doubts about both the scope and schedule for already 25-year old remediation of the former E.I. DuPont De Nemours & Company ammunition plant, according to Public Employees for Environmental Responsibility (PEER).

After decades of ineffective state-overseen cleanup operations, EPA finally took over the cleanup operations last year.  EPA’s initial plan, however, was severely criticized by the U.S. Fish & Wildlife Service for failing to address the fact that “significant levels of contamination will remain” from “mercury, which in certain forms is highly toxic and biomagnifies via the food web” flowing downstream from the old factory site.  In trying to rewrite its initial plan on the fly, EPA appears to have ensnarled itself in both substantive and procedural knots.  In yesterday’s press release, EPA stated:

“The EPA had previously finalized a plan, which was contained in a permit requiring cleanup of the Acid Brook delta along with certain other areas in the lake, but additional information including results of recent sampling in Pompton Lake have provided EPA the basis for revising that permit. The new permit requirements are currently being developed by EPA, with a goal of proposing a draft permit by the fall.”

“This is a major setback for the Pompton Lakes community as EPA’s stumble will prolong toxic removal work for at least two years,” stated New Jersey PEER Director Bill Wolfe who had pressed for the FWS review.  “Behind closed doors, EPA has been negotiating with DuPont to shrink both the size and thoroughness of the required cleanup which DuPont will have to pay for.”

Among the issues EPA will have to re-address are –

  • The size of the cleanup which had grown from an initial 26 acres to embrace 40 acres;
  • How downstream migration of chemicals will be handled; and
  • What form of wildlife and ecological monitoring will occur to track ultra-high concentrations of mercury, lead, copper, selenium, zinc and other chemical in the food-chain and sediments,

“This raises questions far beyond Pompton Lakes about the public health safeguards for more than 3,000 similarly contaminated sites across the country for which EPA is responsible,” added Wolfe, noting that far more sites are covered by the less rigorous Resource Conservation and Recovery Act (RCRA) than the better known Superfund program even though many RCRA sites, such as Pompton Lakes, are just as or even more contaminated than Superfund sites.  “This has all the earmarks of DuPont pulling strings behind the scenes.”

###

Read the EPA press release

http://www.peer.org/assets/docs/epa/5_1_14_EPA_Pompton_News_Release.pdf

See U.S. Fish & Wildlife Service critique

http://www.peer.org/news/news-releases/2012/02/21/federal-wildlife-agency-flays-jersey-pompton-lakes-plan/

Look at toxic migration downstream

http://www.peer.org/news/news-releases/2012/01/26/dupont-pompton-lake-pollution-may-be-headed-downstream-/

Visit EPA’s Pompton Lakes web-center

http://www.epa.gov/Region2/waste/dupont_pompton/index.html 

View Pompton lakes and other Jersey toxic sites still in regulatory limbo

http://www.peer.org/news/news-releases/2012/03/05/epa-discloses-nine-more-superfund-eligible-sites-in-new-jersey/ 

New Jersey PEER is a state chapter of a national alliance of state and federal agency resource professionals working to ensure environmental ethics and government accountability

This entry was posted in Uncategorized. Bookmark the permalink.

1,335 Responses to BREAKING: EPA Withdraws Dupont’s Pompton Lakes Mercury Cleanup Permit

  1. Pingback: camiseta manchester united 2014 manga larga

  2. Pingback: nike roshe run mens footasylum

  3. Pingback: shoes at nike outlet

  4. Pingback: manchester city women's shirt

  5. Pingback: fc bayern trikot manuel neuer

  6. Pingback: maillot de foot cameroun

  7. Pingback: Juventus AuswC3A4rtstrikot 2013 14 PIRLO Trikot http://coroer.dk/default.php?Celtic-FodboldtrC3B8jer

  8. Pingback: deutschland trikot 2012 ausw?rts damen

  9. Pingback: seleccion espa?ola camiseta oficial

  10. Pingback: barcelona trikot puyol

  11. Pingback: camisas fabricas de francia

  12. Pingback: camisetas roma antigua

  13. Pingback: crea tu camiseta de futbol del barcelona

  14. Pingback: eden hazard maillot psg

  15. Pingback: nueva camiseta real madrid fly emirates

  16. Pingback: roshe run nike mens

  17. Pingback: nike running shoes free

  18. Pingback: ausw?rtstrikot deutschland 2015

  19. Pingback: nike free 2

  20. Pingback: wm trikot 2014 ghana

  21. Pingback: camisetas electronicas en ecuador

  22. Pingback: camisa da bandeira da inglaterra para vender

  23. Pingback: maillot de marseille pour bebe

  24. Pingback: manchester united golf shirts

  25. Pingback: camiseta alternativa athletic bilbao

  26. Pingback: liverpool home kit 5 6 years

  27. Pingback: deutschland trikot enge version kaufen

  28. Pingback: maillot exterieur espagne coupe du monde 2014

  29. Pingback: acheter maillot equipe de france foot 2014

  30. Pingback: chelsea fc gold kit

  31. Pingback: camiseta de chelsea pes 2013 ps3

  32. Pingback: camiseta real madrid original verde 2013

  33. Pingback: camisa da italia para copa 2014

  34. Pingback: camiseta nueva colombia roja

  35. Pingback: u de chile camiseta 2015

  36. Pingback: man city alternate kit 2012

  37. Pingback: france allemagne nouveau maillot

  38. Pingback: inter milan player issue jersey

  39. Pingback: cartier juste un clou

  40. Pingback: segunda equipacion portero espa?a

  41. Pingback: lanzamiento de la camiseta de la seleccion colombia 2013

  42. Pingback: nike air max 360 shoes

  43. Pingback: fc bayern trikot 2013 bestellen

  44. Pingback: camiseta del athletic bilbao 2013

  45. Pingback: trikots portugal 2012

  46. Pingback: netherlands international jersey

  47. Pingback: nike air max 95 for cheap

  48. Pingback: maillot angleterre mondial 2014

  49. Pingback: bvb trikot g?tze 2012

  50. Pingback: camisetas de u de chile 2012

Leave a Reply