BREAKING: EPA Withdraws Dupont’s Pompton Lakes Mercury Cleanup Permit

EPA Effectively Admits Legal Error 

Withdrawn Permit Moots Dupont’s Appeal

Unclear How Ecological Impacts and USFWS Concerns Will Be Addressed

The permit appeal process should not be used as hammer by Dupont to force EPA concession and it is not a permission slip for EPA to negotiate a cleanup plan Dupont will support behind closed doors. ~~~ Bill Wolfe, 8/30/13

Keep in mind that this withdrawal occurred after months of closed door negotiations with Dupont in response to Dupont’s legal appeal of the final permit last year. (see

That chronology strongly suggests that EPA is folding and relaxing cleanup requirements, not merely correcting the minor procedural defect Dupont alleged. If the EPA intent was to remedy a procedural defect, they could have re-proposed the permit months ago.

From our friends at PEER:

Press Release 

For Immediate Release:  Thursday, May 1, 2014

Contact:  Bill Wolfe (609) 397-4861; Kirsten Stade (202) 265-7337 

EPA Badly Fumbles Jersey Pompton Lakes Toxic Cleanup

Permit Withdrawal Throws Eco-Safeguards into Doubt While Adding Years of Delay 

Trenton — The U.S. Environmental Protection Agency is making one of the nation’s longest toxic removal operations even longer with the announcement that it is withdrawing its permit for the heavily contaminated Pompton Lakes area cleanup plan.  By going back to the drawing board, EPA raises serious doubts about both the scope and schedule for already 25-year old remediation of the former E.I. DuPont De Nemours & Company ammunition plant, according to Public Employees for Environmental Responsibility (PEER).

After decades of ineffective state-overseen cleanup operations, EPA finally took over the cleanup operations last year.  EPA’s initial plan, however, was severely criticized by the U.S. Fish & Wildlife Service for failing to address the fact that “significant levels of contamination will remain” from “mercury, which in certain forms is highly toxic and biomagnifies via the food web” flowing downstream from the old factory site.  In trying to rewrite its initial plan on the fly, EPA appears to have ensnarled itself in both substantive and procedural knots.  In yesterday’s press release, EPA stated:

“The EPA had previously finalized a plan, which was contained in a permit requiring cleanup of the Acid Brook delta along with certain other areas in the lake, but additional information including results of recent sampling in Pompton Lake have provided EPA the basis for revising that permit. The new permit requirements are currently being developed by EPA, with a goal of proposing a draft permit by the fall.”

“This is a major setback for the Pompton Lakes community as EPA’s stumble will prolong toxic removal work for at least two years,” stated New Jersey PEER Director Bill Wolfe who had pressed for the FWS review.  “Behind closed doors, EPA has been negotiating with DuPont to shrink both the size and thoroughness of the required cleanup which DuPont will have to pay for.”

Among the issues EPA will have to re-address are –

  • The size of the cleanup which had grown from an initial 26 acres to embrace 40 acres;
  • How downstream migration of chemicals will be handled; and
  • What form of wildlife and ecological monitoring will occur to track ultra-high concentrations of mercury, lead, copper, selenium, zinc and other chemical in the food-chain and sediments,

“This raises questions far beyond Pompton Lakes about the public health safeguards for more than 3,000 similarly contaminated sites across the country for which EPA is responsible,” added Wolfe, noting that far more sites are covered by the less rigorous Resource Conservation and Recovery Act (RCRA) than the better known Superfund program even though many RCRA sites, such as Pompton Lakes, are just as or even more contaminated than Superfund sites.  “This has all the earmarks of DuPont pulling strings behind the scenes.”

###

Read the EPA press release

http://www.peer.org/assets/docs/epa/5_1_14_EPA_Pompton_News_Release.pdf

See U.S. Fish & Wildlife Service critique

http://www.peer.org/news/news-releases/2012/02/21/federal-wildlife-agency-flays-jersey-pompton-lakes-plan/

Look at toxic migration downstream

http://www.peer.org/news/news-releases/2012/01/26/dupont-pompton-lake-pollution-may-be-headed-downstream-/

Visit EPA’s Pompton Lakes web-center

http://www.epa.gov/Region2/waste/dupont_pompton/index.html 

View Pompton lakes and other Jersey toxic sites still in regulatory limbo

http://www.peer.org/news/news-releases/2012/03/05/epa-discloses-nine-more-superfund-eligible-sites-in-new-jersey/ 

New Jersey PEER is a state chapter of a national alliance of state and federal agency resource professionals working to ensure environmental ethics and government accountability

This entry was posted in Uncategorized. Bookmark the permalink.

1,335 Responses to BREAKING: EPA Withdraws Dupont’s Pompton Lakes Mercury Cleanup Permit

  1. Pingback: Oakley C Six Sunglasses

  2. Pingback: tungsten

  3. Pingback: Oakley Half Jacket Sunglasses

  4. Pingback: New Oakley Sunglasses

  5. Pingback: 2015 New Oakley Sunglasses

  6. Pingback: Oakley Monster Dog Sunglasses

  7. Pingback: Oakley Fuel Cell Sunglasses

  8. Pingback: new balance buty

  9. Pingback: Buty+Nike+damskie

  10. Pingback: Kurtki Moncler

  11. Pingback: Oakley Scalpel Sunglasses

  12. Pingback: Oakley Half Straight Jaquetas

  13. Pingback: Oakley Flak Jacket Sunglasses

  14. Pingback: Oakley Holbrook Sunglasses

  15. Pingback: Oakley Antix Sunglasses

  16. Pingback: Oakley Radar Range Sunglasses

  17. Pingback: Oakley Polarized Sunglasses

  18. Pingback: Oakley EK Signature Eyewear

  19. Pingback: Oakley Jupiter Squared

  20. Pingback: Oakley Oil Rig Sunglasses

  21. Pingback: camiseta atletico madrid segunda equipacion

  22. Pingback: Other Oakley Sunglasses

  23. Pingback: camisas del real madrid para mujer

  24. Pingback: Oakley Juliet Sunglasses

  25. Pingback: Oakley Commit Sunglasses

  26. Pingback: Oakley Batwolf Sunglasses

  27. Pingback: camiseta argentina 2014 original

  28. Pingback: Oakley Jawbone Sunglasses

  29. Pingback: camisas do barcelona para comprar

  30. Pingback: jersey timnas brazil home 2014

  31. Pingback: liverpool shirt india

  32. Pingback: camiseta chelsea 2013 ps2

  33. Pingback: camiseta de argentina precio

  34. Pingback: klassiker neue juventus buffon 1 heimtrikot streifen nike 2014 2015 p 3018

  35. Pingback: camisa del barca 2014 manga larga

  36. Pingback: signed manchester united shirt 1999

  37. Pingback: tienda de camisetas de futbol espa?a

  38. Pingback: commercial blenders

  39. Pingback: Sweetheart 9760 dress

  40. Pingback: phone parts

  41. Pingback: fotos de la nueva camiseta del barcelona 2013

  42. Pingback: nike outlet golf

  43. Pingback: flip flop

  44. Pingback: imagenes de la camiseta del milan 2014

  45. Pingback: portable lounger

  46. Pingback: maillot de bain bresilien ebay

  47. Pingback: camiseta real madrid baloncesto 2014

  48. Pingback: camiseta de futbol de holanda 2013

  49. Pingback: outlet hogan

  50. Pingback: protective goggle

Leave a Reply