BREAKING: EPA Withdraws Dupont’s Pompton Lakes Mercury Cleanup Permit

EPA Effectively Admits Legal Error 

Withdrawn Permit Moots Dupont’s Appeal

Unclear How Ecological Impacts and USFWS Concerns Will Be Addressed

The permit appeal process should not be used as hammer by Dupont to force EPA concession and it is not a permission slip for EPA to negotiate a cleanup plan Dupont will support behind closed doors. ~~~ Bill Wolfe, 8/30/13

Keep in mind that this withdrawal occurred after months of closed door negotiations with Dupont in response to Dupont’s legal appeal of the final permit last year. (see

That chronology strongly suggests that EPA is folding and relaxing cleanup requirements, not merely correcting the minor procedural defect Dupont alleged. If the EPA intent was to remedy a procedural defect, they could have re-proposed the permit months ago.

From our friends at PEER:

Press Release 

For Immediate Release:  Thursday, May 1, 2014

Contact:  Bill Wolfe (609) 397-4861; Kirsten Stade (202) 265-7337 

EPA Badly Fumbles Jersey Pompton Lakes Toxic Cleanup

Permit Withdrawal Throws Eco-Safeguards into Doubt While Adding Years of Delay 

Trenton — The U.S. Environmental Protection Agency is making one of the nation’s longest toxic removal operations even longer with the announcement that it is withdrawing its permit for the heavily contaminated Pompton Lakes area cleanup plan.  By going back to the drawing board, EPA raises serious doubts about both the scope and schedule for already 25-year old remediation of the former E.I. DuPont De Nemours & Company ammunition plant, according to Public Employees for Environmental Responsibility (PEER).

After decades of ineffective state-overseen cleanup operations, EPA finally took over the cleanup operations last year.  EPA’s initial plan, however, was severely criticized by the U.S. Fish & Wildlife Service for failing to address the fact that “significant levels of contamination will remain” from “mercury, which in certain forms is highly toxic and biomagnifies via the food web” flowing downstream from the old factory site.  In trying to rewrite its initial plan on the fly, EPA appears to have ensnarled itself in both substantive and procedural knots.  In yesterday’s press release, EPA stated:

“The EPA had previously finalized a plan, which was contained in a permit requiring cleanup of the Acid Brook delta along with certain other areas in the lake, but additional information including results of recent sampling in Pompton Lake have provided EPA the basis for revising that permit. The new permit requirements are currently being developed by EPA, with a goal of proposing a draft permit by the fall.”

“This is a major setback for the Pompton Lakes community as EPA’s stumble will prolong toxic removal work for at least two years,” stated New Jersey PEER Director Bill Wolfe who had pressed for the FWS review.  “Behind closed doors, EPA has been negotiating with DuPont to shrink both the size and thoroughness of the required cleanup which DuPont will have to pay for.”

Among the issues EPA will have to re-address are –

  • The size of the cleanup which had grown from an initial 26 acres to embrace 40 acres;
  • How downstream migration of chemicals will be handled; and
  • What form of wildlife and ecological monitoring will occur to track ultra-high concentrations of mercury, lead, copper, selenium, zinc and other chemical in the food-chain and sediments,

“This raises questions far beyond Pompton Lakes about the public health safeguards for more than 3,000 similarly contaminated sites across the country for which EPA is responsible,” added Wolfe, noting that far more sites are covered by the less rigorous Resource Conservation and Recovery Act (RCRA) than the better known Superfund program even though many RCRA sites, such as Pompton Lakes, are just as or even more contaminated than Superfund sites.  “This has all the earmarks of DuPont pulling strings behind the scenes.”

###

Read the EPA press release

http://www.peer.org/assets/docs/epa/5_1_14_EPA_Pompton_News_Release.pdf

See U.S. Fish & Wildlife Service critique

http://www.peer.org/news/news-releases/2012/02/21/federal-wildlife-agency-flays-jersey-pompton-lakes-plan/

Look at toxic migration downstream

http://www.peer.org/news/news-releases/2012/01/26/dupont-pompton-lake-pollution-may-be-headed-downstream-/

Visit EPA’s Pompton Lakes web-center

http://www.epa.gov/Region2/waste/dupont_pompton/index.html 

View Pompton lakes and other Jersey toxic sites still in regulatory limbo

http://www.peer.org/news/news-releases/2012/03/05/epa-discloses-nine-more-superfund-eligible-sites-in-new-jersey/ 

New Jersey PEER is a state chapter of a national alliance of state and federal agency resource professionals working to ensure environmental ethics and government accountability

This entry was posted in Uncategorized. Bookmark the permalink.

1,335 Responses to BREAKING: EPA Withdraws Dupont’s Pompton Lakes Mercury Cleanup Permit

  1. Pingback: detayfuarcilik.com/kongre/

  2. Pingback: roger vivier online

  3. Pingback: hogan sandali

  4. Pingback: hollister sverige

  5. Pingback: asics urban camo

  6. Pingback: aziende abbigliamento lazio

  7. Pingback: scarpe hogan primavera 2015

  8. Pingback: maglia milan bianca 2013

  9. Pingback: outlet hogan brescia

  10. Pingback: asics kayano 19

  11. Pingback: ray ban sunglasses 3025 aviator silver mirror w3275

  12. Pingback: hogan bimba 2015

  13. Pingback: asic nimbus

  14. Pingback: lavalve.com/

  15. Pingback: collezione hogan primavera estate 2014

  16. Pingback: jordan 8 three time's a charm

  17. Pingback: cheap air jordans

  18. Pingback: hogan black sneakers

  19. Pingback: orange nike football boots

  20. Pingback: nike air max zero,air max zero,air max zero 2015,air max 2015,nike air zero,air max zero for sale

  21. Pingback: ben hogan 5 fundamentals

  22. Pingback: soccer shoes nike mercurial

  23. Pingback: louis vuitton oslo

  24. Pingback: fitflop sko

  25. Pingback: pay4you

  26. Pingback: new balance store oakville

  27. Pingback: maglie portiere rinat

  28. Pingback: hogan bimba

  29. Pingback: jordan threepeat 8

  30. Pingback: Foakleys

  31. Pingback: hogan rebel outlet

  32. Pingback: replica foakleys

  33. Pingback: Replica Oakley Sunglasses

  34. Pingback: asics onitsuka tiger

  35. Pingback: jack wills uk

  36. Pingback: cheap asics

  37. Pingback: brooke hogan breast

  38. Pingback: asics 2170 womens

  39. Pingback: hogan golf bags

  40. Pingback: www.yoursantorini.com

  41. Pingback: cheap ray ban sunglasses

  42. Pingback: Buty Nike Air Max 2013 damskie

  43. Pingback: Air Max Tailwind +5 Męskie

  44. Pingback: cheap new balance

  45. Pingback: jackwills

  46. Pingback: new balance tr

  47. Pingback: ray ban round blue

  48. Pingback: new balance classic running shoes

  49. Pingback: planet lace and bandage dress

  50. Pingback: prezzo scarpe hogan migliore in linea

Leave a Reply